Apex Directional Drilling serves Carmel-by-the-Sea, Pebble Beach, Carmel Valley, and the Monterey Peninsula with HDD boring and trenchless utility installation. We've worked at Pebble Beach Golf Links — we understand the standards the Peninsula demands.
The Monterey Peninsula's strict aesthetic standards, coastal terrain, and high-value properties make trenchless HDD the only acceptable method for underground utility work. We've completed irrigation sleeve installations at Pebble Beach Golf Links and serve residential and commercial clients throughout Carmel, Pacific Grove, and Monterey.
Bore under driveways, patios, and landscaping to install gas, water, electric, and sewer laterals — zero yard damage.
Learn MoreUtility crossings and conduit runs for commercial sites, parking lots, and industrial properties in Carmel.
Learn MoreAll four ADU utility connections — power, sewer, water, and gas — bored trenchlessly in a single mobilization.
Learn MoreUnderground conduit for solar panel systems bored under driveways and slabs — no concrete cutting required.
Learn MoreConduit run from panel to garage or parking area for Level 2 and DC fast charger installations in Carmel.
Learn MoreOQ-certified PG&E gas and electric boring with full crossbore documentation and ITS card scanning.
Learn MoreBased in Santa Clara — we mobilize fast to Carmel with no out-of-area travel fees or delays.
CSLB #838568 (A, B, HazMat). Fully insured for all residential and commercial work in Monterey County.
Qualified for PG&E gas and electric installations — full documentation and crossbore paperwork included.
Trenchless first — we protect driveways, landscaping, and hardscape on every Carmel job.
Deep knowledge of Monterey County soil conditions, city permit requirements, and utility corridors.
Fast quotes — most Carmel estimates turned around same or next day. Call (408) 849-6200.
Call or email for a free project estimate. We serve Carmel and all of Monterey County. Most quotes turned around within 24 hours.