apexborecom.png

Directional Drilling: Underground Installing
Without the Disruptions

FORT MASON, SAN FRANCISCO, CA.

FORT MASON, SAN FRANCISCO, CA.


NOT ALL DIRECTIONAL DRILLING COMPANIES ARE THE SAME.
GIVE US A SHOT AND GET THE JOB DONE RIGHT.

If you would like to schedule a site meeting to go over your project details so we can provide you with a proposal or would like to simply send us drawings and details about your project please call us at 408-849-6200 or email us at david@rdirt.com we look forward to providing yo with a solution to your needs.

HIGH TECH DIRECTIONAL DRILLING

HIGH TECH DIRECTIONAL DRILLING

POTHOLING CROSSING UTILITIES BEFORE BORE

POTHOLING CROSSING UTILITIES BEFORE BORE

IMG_7649.jpg
IMG_7674.jpg
IMG_7614.jpg
IMG_7673.jpg
IMG_7679.JPG
IMG_7638.jpg
IMG_9853.jpg
IMG_2873.jpg
jt20apex.jpg
DJI_0087.JPG

408.849.6200
 

IT’S OUR PASSION

BUILDING UNDERGROUND INFRASTRUCTURE OF THE FUTURE TODAY..

We solve Complex underground issues with directional boring we offer full turn-key project solutions for utilities projects.

DIRECTIONAL DRILLING ONSITE & ENCROACHMENT


DIRECTIONAL DRILLING . UNDERGROUND UTILITIES  . HYDROVAC . POTHOLING SERVICES
SEWER / STORM VIDEO PRE/POST PG&E CROSS BORE PLAN . WEST VALLEY SANITATION CONTRACTOR

Trench less Method: Water Main Replacement, Sewer line replacement, Gas Lines, Electrical Conduits

DJI_0112.JPG

We specialize in tight access, complex residential turnkey utilities,and
PG&E Gas, Electric, and communications conduits, force mains, sewers, storm.

Mike, Ring-O-Matic Man!

Mike, Ring-O-Matic Man!

IMG_6439.jpg

don't tear it up. go under it!

For over 21 years we have been installing water, gas, telephone, electric, cable television and force main sewer lines by means of directional drilling. We operate multiple rigs with capabilities that range from house services to larger diameter lines. Highways, bodies of water and environmentally sensitive areas are typical work zones for our rigs. Our success rate is second to none.

Directional drilling has become the industry standard for placement of product in areas congested with existing utilities, finished landscaping, environmentally sensitive, or prone to erosion. Core has become very familiar with the different soil types and challenges they create.

We have the ability and experience to drill under creeks, rivers, roadways, wooded and landscaped areas, as well as solid rock. We pride ourselves on the number of projects we have drilled and the expertise with which we do it.

IMG_6491.jpg

The process generally includes five distinct phases as follows:

  1. Planning, Preliminary survey.

  2. Selecting the drilling units and drilling tools.

  3. Drilling a small pilot bore hole, using technology that allows the drill to be steered and tracked from the surface.

  4. Enlarging the hole by pulling back increasingly large reamers.(Backreaming or upsizing bore)

  5. Pulling in the pipe.

A well planned HDD Operation includes preliminary survey of the bore path area, concerning other existing lines and the soil condition. Locating all existing services and plotting them on a Drawing, then Planning the best drilling path and plot that also on the drawing, avoiding all existing services.

IMG_6444.jpg

 

What is Directional boring?, commonly called horizontal directional drilling or HDD Drilling, is a steerable trenchless method of installing underground pipe, conduit, or cables in a shallow arc along a prescribed bore path by using a surface-launched drilling rig, with minimal impact on the surrounding area.

Survey of existing services and planned directional drilling route

The Choice of the drilling unit depends upon the bore length, the diameter of the pipe to be installed and the soil quality. It is important to choose the correct Drilling unit and tools to suit the bore length, and conditions. Site operation starts with Drilling of the pilot hole from the surface on one side of the obstacle to be crossed. Drilling continuous along a designed profile below and beyond the obstacle, to exit at the surface on the other side.

 

IMG_6455.jpg

Drilling pilot bore hole

 

The pilot bore is launched from the surface at an angle between 6 and 15 degrees to the horizontal, and transitions to horizontal as the required depth is reached. A bore path of very gradual curvature or near straight alignment is normally followed to minimize friction and to stay within the allowable joint deflection and the allowable bend radius for the pipe. This minimizes the chance of getting the pipe string “hung up” in the soil or damaging the pipe string.

 

Drilling pilot bore hole

The fourth phase entails the reaming of the pilot hole to a diameter sufficiently large enough to accept the pipeline or conduit.

Enlarging pilot hole

The pilot hole is enlarged by pulling back increasingly larger reamers, or reaming heads, from the pipe “Exit Point” to the rig side, conventionally defined as “Entry Point”. To achieve the appropriate bore path size it may be necessary to perform several reaming operations. Generally, all reaming procedures prior to the actual product pipe installation are referred to as Pre Reaming, and the final ream to which the product pipe is connected is referred to as the ‘Back Reaming’.

Retrofit Catch Sump Basin into outside stair well to pump water up to gravity drain system directional bored under salb and pulled back 1” conduit for electric and 1 1/2” for sump system.

IMG_6441.jpg

 

Enlarging pilot hole

 

Finally, the pipeline or conduits is pulled into a place within the enlarged hole. These processes are discussed in greater details in the method statement.

Pulling in the pipe(s)

After the pre reams procedures, the Pulling Head and connecting product pipe are attached to the reamer using a Swivel, a device that isolates the pipe string from the rotation of the HDD drill pipe “Rod”.

The product pipe is then pulled behind the final reamer back through the horizontal directional drill path to the exit pit on the rig side.

 

IMG_6499.jpg

Pulling in the pipe

There are numerous advantages of the directional drilling installation method over alternative construction methods. Environmental issues are minimized as operations are limited to relatively small areas at each end of, as opposed to the complete length of, the installation.

“In many cases HDD is called for by project owners simply because they want to avoid trenching because of the negative social impact of open-cut construction and to avoid the impact it causes to businesses and damage to meticulously-landscaped properties. In addition, HDD often reduces the time needed to complete a project and actually reduces the cost of construction.”

Our Directional Drilling crew are experienced and professional. Safety is the top priority on every job.










HDD has become the first choice when installing pipelines and underground utilities without disturbing the local environment and existing infrastructure.

Our Horizontal Directional Drilling is the ideal trenchless solution for underground installations. 

Clear Choice










Whether you are installing gas lines, fiber optics, telecommunications, hydro or water main Horizontal Directional Drilling is the way to go. Your project will benefit from the experienced crews and state of the art equipment employed by us..

Our Underground Utilities Projects Include:

  • Water Lines

  • Water Mains

  • Sewer Lines Gravity & Force Mains

  • Power Lines

  • Phone Lines

  • Cable Lines

  • Fiber Optic Lines

  • Gas Lines

  • Irrigation Lines

IMG_6478.jpg

We have seen firsthand how advantageous this technique can be in certain situations. What follows is a brief list of just some of the advantages that horizontal drilling can bring to a project.

  • Faster Installation — By eliminating the need to dig cumbersome trenches, projects can be completed much faster than many people realize.

  • Lower Installation Cost — A smaller crew means less manpower, which will significantly lower the costs of the overall project.

  • Flexibility — Terrain, landscaping, and geographical features are no longer considered insurmountable obstacles when horizontal drilling is used. This means that your ideas or needs can come to life when preciously they would have been impossible.

  • Little Soil Contamination — Because the piping used may be seamless with this method, soil contamination is virtually eliminated.

  • Maintains Environmental Integrity — Disrupting an environment can have negative consequences that go far beyond mere cost and expediency. Horizontal drilling makes it possible to preserve the surrounding environment in its pristine state without having to compromise your ideas or spend a fortune on mitigation.

IMG_6437.jpg

YOU CAN TRUST CORE ENGINEERING INC. WITH ALL OF YOUR HORIZONTAL DRILLING REQUIREMENTS

  • It doesn’t matter whether we are working for a contractor, homeowner, or government agency; we make it a point to adhere to the following business principles:

  • Stay on Schedule

  • Keep Costs to a Minimum

  • Stay on Budget

  • Ensure that All Workmanship is of the Highest Standard

  • Our highly skilled team utilizes our state-of-the-art equipment to complete any Bay Area horizontal directional drilling job no matter how difficult or challenging, and we are eager to put our more than ten years of experience to work for you.

  • We recognize that your situation is unique, and will require a great deal of personalized care and attention to detail. From our initial inspection, until the job is complete, we will provide you with unparalleled experience and attention to detail. We are proud to serve Silicon Valley and the surrounding region.











  • On demand. Road and Street Boring
    Utility Excavation
    Water Remediation
    Sub-Structure Boring
    Sewer Forced Mains
    Relocation Projects
    Repair Inter-duct (Conduit)
    Highway Boring
    Driveway Boring Parking
    Lot Boring
    Foundation Boring
    River Boring
    Fiber Optic Bore
    and others...

IMG_6436.jpg